A032 12V 2WD off-Road UTV 2-Seater Ride on Car Electric Kids Toy

Still deciding? Get samples of $ !
Request Sample

Product Description

📋 Basic Information
Model NO.
A032
Color
White Black Green Red Gold Pink Blue Camo-Pink Cam
Frame Material
Metal
Material
Plastic
Item Size
135*95*80
Gw / Nw
41 / 35
Motor
12V550*2
Battery
12V14ah
Media Player
Bluetooth, MP3, USB, TF Card
Wheel
Plastic Wheel, EVA Wheel
Seats
2
Suspension
Rear Suspension
MOQ
30 PCS
🚀 Product Description
Off-Road UTV
A032 12V 2WD Off-Road UTV 2-Seater Ride On Car Electric Kids Toy

Suitable Age: 3+ | Load Capacity: 60kg / 132 lb | Speed: 6~9 kph / 4~5.5 mph

🌟 Key Features

  • 1 button start
  • Bluetooth, MP3, USB, TF card
  • LED front and rear light
  • Big wheel & Rear suspension
  • High and Low speed
  • 2 adjustable seats
  • Double door openable

🛠 Upgrade Options

  • Spray Painting
  • Leather seat
  • MP4 Player
  • US / RoHS standard
  • EVA Wheels
  • Car canopy

📦 Packaging

  • Item Size: 135*95*80 (CM)
  • CTN Size: 131*83*46 (CM)
  • 1 pc / Carton
  • GW / NW: 41 / 35 (KG)
  • Load Qty: 140 pcs / 40 HQ
Rear Suspension
Rear Suspension
Leather Seat
Leather Seat Optional
Big Wheel
Big Wheel
Hood Openable
1-Button Hood Openable
Car canopy
Car Canopy Optional
Standard View
Standard Without Canopy
Side View
Front View
🏭 Manufacturing & Excellence
Factory Production
Workshop
Assembly Line
Storage
Certifications
❓ Frequently Asked Questions
1. Can I get a sample and how long will it take? Definitely. Samples are available upon payment of sample and express delivery fees. We typically deliver within approximately 7 business days after receiving payment.
2. What is the Minimum Order Quantity (MOQ)? The MOQ for each specific model is 100 pieces.
3. Do you offer customization options? Yes, we offer various customizable options including product color, customer logos, carton markings, and user manual languages.
4. Can I mix different models in one container? Yes, different models can be mixed together in a single container.
5. What is the estimated delivery time? The estimated delivery time is generally 30–45 business days after payment confirmation.
6. How is quality control managed? Quality control is strictly implemented at incoming, in-process, and final inspection stages according to ISO 9001 Standards.

Related Products